Brackenville Road - SR 41, Lancaster Pike to N258, Barley Mill Road

Project Limits:

The project includes work on Brackenville Road from Lancaster Pike to Barley Mill Road and on Barley Mill Road from Brackenville Road to 1300’ south of the intersection.

Project Need:

The project needs include drainage improvements and safety. The drainage improvements needed include increasing pipe capacity and collecting water from underground springs. The safety improvements needed include improving roadway geometry to reduce the potential for run-off-the-road crashes, reducing the potential of roadway collapse from stream encroachment on the roadway, and removing water from the roadway to prevent freezing during the winter.

Project Overview :

The project involves drainage improvements, pavement rehabilitation, and utility pole relocations along Brackenville Road from Lancaster Pike to the sharp curve in the area of Ashland Nature Center. At the curve, the project includes drainage improvements, pavement reconstruction, utility pole relocations, guardrail installation, slope stabilization, and stream relocation/restoration. The intersection of Brackenville Road and Barley Mill Road will be reconstructed and drainage improvements will be completed. Work on Barley Mill Road from Brackenville Road to 1,300 feet south of the intersection includes drainage improvements.

Current Construction Start Date:

The project is currently in final design. We anticipate contract advertisement in the fall of 2007.

Contractor and Cost:

To be determined

Construction Schedule:

To be determined
 
PUBLIC FEEDBACK
Public Relations This link opens an email client
302.760.2080
800.652.5600 (DE only)

Joseph Hofstee, P.E. This link opens an email client
Project Manager
302.760.2358
 
 
 