Projects
SR1, SR30 Grade Separated Intersection
|
Project Name
SR1, SR30 Grade Separated Intersection
Project Limits
The project is located along the SR1 corridor, just South of Milford. More
specifically at the intersection of SR1 with SR30, Wilkins Road & Cedar Neck
Road. This is the intersection with the flashing red lights at the Wilkins and
Cedar Neck Road approaches and flashing yellow on SR 1 north and southbound. The
approximate limits stretch from 1400 feet North of the existing intersection and
3600 feet to the South. The eastern limits extend approximately 1800 feet along
Cedar Neck Road, and the western approximately 1400 feet along Wilkins Road.
Project Need
This intersection has been designated for improvements under several
programs. Initially, during the Corridor Capacity Preservation Program, an
overpass was proposed to improve capacity and safety at the intersection.
Additionally, during the Highway Safety Improvement Program analyses, this
intersection has been designated for safety improvements due to the frequency
and severity of accidents.
Project Overview
This project will replace the existing at-grade intersection with a
grade-separated intersection. This will be accomplished by the installation of
an overpass and a connecting ramp system for access. The northbound access will
be achieved via a loop ramp to the southeast quadrant of the project. The
southbound traffic will access the overpass via an access ramp that ties into
SR30 to the south of the overpass. Improvements will also be made to the
existing intersection of Wilkins Road and Cedar Creek Road to include the
installation of a signal and auxiliary lanes to accommodate the various turning
movements that occur at this location.
Project Schedule
Anticipated/Actual Start Date - Construction is anticipated to
start in Summer of 2012.
Anticipated/Actual Completion Date - Construction is expected to take two construction seasons with activities wrapping up in late Summer to early Fall of 2013. |
|